22-0019 Colbert County Commission Water System Improvements (nr)
The project consists of replacement of existing high service pump check valves, installation of a high service pump station surge relief valve, replacement of high service pump motors, installation of high service pump variable frequency drives (VFDs), integration of VFDs into existing SCADA system, and replacement of existing altitude valve at Smallwood tank.
Addendum 1
(click to expand/collapse)

Name | Size | ||
Addendum1-Specs | 2.1 MB |
Addendum 2
(click to expand/collapse)

Name | Size | ||
Addendum2-Specs | 559.7 KB |
Addendum 3
(click to expand/collapse)

Name | Size | ||
Addendum3-Specs | 559.4 KB |
Addendum 4
(click to expand/collapse)

Name | Size | ||
Addendum4-Specs | 567.6 KB |
Addendum 5
(click to expand/collapse)

Name | Size | ||
Addendum5-Specs | 807.1 KB |
Addendum 6
(click to expand/collapse)

Name | Size | ||
Addendum6-Specs | 2.0 MB |
Addendum 7
(click to expand/collapse)

Name | Size | ||
Addendum7-Specs | 2.3 MB |